Partnerships



    Composites Europe 2010

    JEC Asia Show 2010

    The Composites Engineering Show

Awards

     

    An Award-Winning Company! 

    eBusiness Award Winner

    Regional Winner - Shell Springboard

    Champion - Broadband Britain

    E-Commerce Award

    Biomat.net Top 5 Site

    The Latest editions of RTM today and DSM Composite Resins newsletters are exclusively available from the netcomposites website, RTM today is published by Plastech TT Ltd, whilst Tanks & Pipes, Sizings & Binders, Automotive and Marine are published by DSM Composite Resins. Click the RTM or DSM image below to link to the relevant pages. 

    RTM Today Spring 2007

     

Final Assembly Begins on First Boeing 787 Dreamliner









Final assembly of the Boeing 787 Dreamliner began last week with a ceremony in Everett, Washington.

"Today we begin assembling the first airplane of a new generation," said Scott Strode, 787 vice president of Airplane Definition and Production. "The 787 not only will revolutionize air travel, it represents a new way of building airplanes."

"The 787 production system is the culmination of the lessons we've learned building previous airplanes," said Steve Westby, 787 vice president of Manufacturing and Quality. "Using composites on the 787 airframe has a number of manufacturing advantages. We are able to build huge structures in just one piece, which means we essentially have six major end items coming together in final assembly -- the forward, centre and aft fuselage sections, the wings, the horizontal stabilizer and the vertical fin. "

Since the 787 is assembled from these large assemblies rather than many smaller pieces, traditional monument assembly tools are not necessary. Portable tools, designed with ergonomics in mind, move the assemblies into place. No overhead cranes are used to move airplane structure.

"A composite airframe also means less waste in production and fewer hazardous materials used during the assembly process," Westby said. "This is good news for the environment and for our team of manufacturing technicians building the airplane."

’787

Although the first airplane will take about seven weeks to assemble, the 787 team looks to continuously improve flow time as production ramps up. Ultimately, a 787 will roll out of the factory every three days.

The first 787 will roll out of the factory on July 8, 2007.

Publication Date: 29/05/2007



Subscribe to our Composite News Feed Subscribe to our Composite News Feed

Other items you may also be interested in.

  • NEWS

    High-Performance Non-Crimp Twistless Flax Fabrics Launched at Composites Europe 2010

    Find out more
  • Nidaplast Composites Support Natural Stone and Concrete

    Find out more
  • ACG Demonstrates Composite Expertise at Composites Europe Exhibition 2010

    Find out more
  • PRODUCTS & PUBLICATIONS

    Composites for Automotive, Truck and Mass Transit
    PRICE (GBP) 153.00

    More Details
  • Polymer Nanotube Nanocomposites:

    More Details
  • Fatigue Life Prediction of Composites and Composite Structures

    More Details
  • Your shopping basket is currently empty:





Hot Topics

  • Latest Products

    Composites for Automotive, Truck and Mass Transit
    Price (GBP) 153.00
    Find out more
  • Latest News

    High-Performance Non-Crimp Twistless Flax Fabrics Launched at Composites Europe 2010 Read More
  • Latest Events

    Advanced Composites in Construction 2011
    6 - 8 September 2011, University of Warwick
    Booking details
  • Latest Jobs

    Head of R&D - PAN and Carbon Fibers
    Russia Read More

nike shop

dunk sb

air jordans

jordans

cheap nike